In December of 2006, the Pennsylvania Department of Environmental Protection published document 363-0300-002, also known as the Pennsylvania Stormwater Best Management Practices Manual. Since then, this document has been the primary source of guidance for the selection, testing and design of best management practices (BMPs) throughout the Commonwealth. The manual was intended as guidance and a technical resource for design professionals to meet state and local stormwater management regulations. However, as time went on and engineering design practices evolved, the 2006 Manual lacked the guidance for the new designs. PADEP published several additional guidance documents over the years to further explain loading ratios, level spreaders, etc., but after 17 years, they are giving in and publishing an entirely new guidance document.

On January 28, 2023, PADEP published a draft of document 386-0300-001, also known as the Pennsylvania Post-Construction Stormwater Management (PCSM) Manual. This document is intended to advance the guidance provided in the 2006 manual and add additional information for newer designs like managed release concept facilities and evapotranspiration. One other notable change is the removal of the term BMP. The manual now uses the term Stormwater Control Measures or SCMs. It will take some time to get used to the new terminology, but it was done to better distinguish post-construction stormwater management facilities from during construction erosion and sedimentation control BMPs.     

The document is up to 755 pages in length, and there is a lot of information to go through. I recommend all in the land development industry review the document and provide feedback as appropriate. The draft document is currently open for public comment until April 28, 2023. A link to the document is provided below. Speak up now – if you don’t, you can’t complain about it later!

PENNSYLVANIA POST-CONSTRUCTION STORMWATER MANAGEMENT (PCSM) MANUAL

logo_v1

Howell 
West Chester

1250 Wrights Lane
West Chester, PA 19380

Phone: 610 918 9002
Fax: 610 918 9003

Nave Newell
A Howell Company

900 West Valley Road
Suite 1100
Wayne, PA 19087

Phone: 610 265 8323

Howell 
Philadelphia

215 S. Broad Street
Philadelphia, PA 17055

Phone: 267 889 3360

Terrain
A Howell Company

53 Old Solomons Island Rd. Suite F
Annapolis, MD 21401

Phone: 410 266 1160

Howell 
Harrisburg

5020 Ritter Road #203
Mechanicsburg, PA 17055

Phone: 610 918 9002

ePhase
A Howell Company

1250 Wrights Lane
West Chester, PA 19380

Phone: 610 692 7007

Copyright © 2026 Howell Engineering. Howell Surveying. Howell Environmental. Terrain.   Terms & Conditions   Privacy Policy

s&hdco