What is an MRC BMP and How Can it Help My Project?

 · 
November 4, 2022
 · 
2 min read
Featured Image

To kick things off this week, we are discussing the benefits of an MRC, or Managed Release Concept, stormwater BMP. For starters, it’s important to understand what a BMP is. BMP stands for Best Management Practices and encompasses all the different management tactics of stormwater. This includes basins, swales, detention beds, etc. MRC BMPs act just as any other stormwater management concept, except they are always allowing a small amount of flow to be released from the bed. While slowly allowing the bed to drain, an MRC BMP still allows for evapotranspiration and infiltration like a traditional BMP. So, why do we even use MRCs? Shouldn’t we be trying to infiltrate all the stormwater we can? The answer is that MRCs work wonders on sites with poor infiltration. They are project saving for any development, small or large, riddled with poor soil conditions.

Typically, when we develop a site, we need to compare the pre-construction runoff to the post-construction runoff. In short, we model and calculate the impact that developing a site has on the runoff. After we create this model, we can work through possible ways to manage the increase in runoff. When a site has great infiltration, the size of the BMP gets smaller, and the project becomes easier to deal with, and vice versa for poor infiltration. Using traditional stormwater beds, basins, or other management tactics, we need to infiltrate that difference of runoff. When successfully done, the BMP methodology and calculations are recorded and reported to the township and/or the DEP. That right there is the design process – consolidated a large amount of course – of stormwater management. The beauty of an MRC BMP is that all the volume passing through the BMP is counted as managed. It does not matter if the excess stormwater is being handled through infiltration or evapotranspiration – if the rate of the discharge is controlled, then that difference of runoff is handled.

So next time you take a peek at what site conditions you’re working with, make sure to ask if an MRC may help your site!

logo_v1

Howell 
West Chester

1250 Wrights Lane
West Chester, PA 19380

Phone: 610 918 9002
Fax: 610 918 9003

Nave Newell
A Howell Company

900 West Valley Road
Suite 1100
Wayne, PA 19087

Phone: 610 265 8323

Howell 
Philadelphia

215 S. Broad Street
Philadelphia, PA 17055

Phone: 267 889 3360

Terrain
A Howell Company

53 Old Solomons Island Rd. Suite F
Annapolis, MD 21401

Phone: 410 266 1160

Howell 
Harrisburg

5020 Ritter Road #203
Mechanicsburg, PA 17055

Phone: 610 918 9002

ePhase
A Howell Company

1250 Wrights Lane
West Chester, PA 19380

Phone: 610 692 7007

Copyright © 2026 Howell Engineering. Howell Surveying. Howell Environmental. Terrain.   Terms & Conditions   Privacy Policy

s&hdco